A Ellery company - serving Rialto, CA

Before & After Gallery - Ellery ADU Studio Rialto

ADU Before & After in Rialto, CA

We’ve found that most Rialto homeowners don’t need more promises. They need to see what actually happens when a garage becomes a rental unit, or when a backyard slab turns into a detached studio. These projects are documented with permit sets, photo records, and final inspection sign-offs. The numbers are real. The work is real. Here’s what that looks like.

Call (951) 476-1467

Recent Transformations

Garage Conversion ADU: 2-Car to 1-Bedroom Rental in South Rialto

Before: detached two-car garage with original 1980s roll-up door, uninsulated block walls, and cracked concrete slab in South Rialto
Before: original two-car garage, 1980s construction, no insulation, slab cracked at center seam
After: permitted 480 sq ft one-bedroom ADU with mini-split HVAC, egress window, and full kitchenette
After: 480 sq ft permitted one-bedroom ADU with mini-split, egress window, and full kitchenette

The garage sat behind a single-family home near Alder Avenue, collecting storage boxes and seasonal items. The slab was 4 inches thick, within range for conversion, but the center seam had settled 3/4 inch. We brought in a structural engineer, specified a floating LVT floor system to bridge the variance, and ran new electrical from the main panel via underground conduit. The city required a 5-foot side setback verification, which we confirmed with a surveyor before the permit set went in. Result: a permitted rental unit that rents at market rate, with a documented photo record showing every phase from slab prep to final paint.

New Detached ADU: Backyard Studio in North Rialto Hills

Before: sloped backyard with compacted decomposed granite, no utilities stubbed, and a 6-foot block wall at property line
Before: sloped backyard, no utilities stubbed, block wall at property line requiring setback check
After: 520 sq ft detached studio ADU with Abodu One system, covered porch, and dedicated meter
After: 520 sq ft Abodu One studio with covered porch, dedicated meter, and landscaped access path

This homeowner wanted a detached unit for aging parents, not a rental play. The lot sloped 18 inches from back to front, which meant we needed a stepped foundation rather than slab-on-grade. We specified the Abodu One system, 499 sq ft out of the box, and coordinated their factory delivery with our site prep timeline. The Rialto Fire Department required a 10-foot access path for emergency vehicle clearance, so we regraded the side yard and poured a 6-inch concrete walkway. Under Haven Standard Clause 1, the $187,000 written price covered design, permits, site prep, the modular unit, utility tie-ins, and final inspection. No change orders. The parents moved in 11 weeks after we broke ground.

Junior ADU & Interior Conversion: Attached Studio in Downtown Rialto

Before: 220 sq ft attached storage room with exposed studs, single-pane window, and no independent HVAC
Before: 220 sq ft attached storage room, exposed studs, single-pane window, no independent HVAC
After: permitted Junior ADU with kitchenette, 3/4 bath, separate entrance, and mini-split system
After: permitted Junior ADU with kitchenette, 3/4 bath, separate entrance, and dedicated mini-split

The room was technically part of the main house, accessed through a laundry area. For Junior ADU status, Rialto requires a separate exterior entrance, a kitchenette (not full kitchen), and either a new bathroom or documented shared bathroom access. We cut in a new door on the side elevation, ran a wet wall for the 3/4 bath, and specified a 12,000 BTU mini-split since the existing central system couldn’t handle the load independently. The homeowner’s original estimate from another contractor came in at $89,000 with no permit line item. Our free second opinion identified that they hadn’t budgeted for Title 24 energy compliance or the required HERS verification. Our written price of $67,500 included both. The permit cleared in 6 weeks.

ADU Site Prep & Utilities: Corner Lot in West Rialto

Before: corner lot with abandoned swimming pool, mature pepper trees, and no sewer lateral to the rear yard
Before: corner lot with abandoned pool, mature trees, and no sewer lateral to rear yard
After: graded building pad with new sewer lateral, water service, and electrical trench ready for detached ADU construction
After: graded pad, new sewer lateral, water service, and electrical trench ready for construction

The pool had been non-operational for 14 years. The city of Rialto required a demolition permit, asbestos survey on the plaster, and a compaction report before we’d get the ADU foundation permit. We brought in a geotechnical firm for a soils report, which found expansive clay at 18 inches, not the 30-inch depth we’d hoped for. That changed our foundation spec from standard strip footing to a post-tensioned slab, a $4,200 line-item difference we flagged in writing before the homeowner signed. The pepper trees were in the city’s right-of-way, so we coordinated with Rialto Public Works for a replacement planting plan rather than removal. Total site prep and utilities: $34,800, documented with 147 photos across 9 visits. The detached ADU build starts next month.

Garage Conversion ADU: 1-Car to Efficiency Unit in East Rialto

Before: single-car attached garage with low ceiling, unvented gas water heater, and original 1960s electrical panel
Before: single-car attached garage, low ceiling, unvented gas water heater, 1960s electrical panel
After: 320 sq ft efficiency ADU with raised ceiling, tankless electric water heater, and 200-amp service upgrade
After: 320 sq ft efficiency ADU with raised ceiling, tankless electric, and 200-amp service

The ceiling was 7 feet 2 inches, below the 7-foot 6-inch minimum for habitable space in San Bernardino County. We specified a scissor-truss retrofit to gain 10 inches of headroom without altering the roofline, which kept us clear of the planning department’s design review trigger. The 1960s Zinsco panel was a known fire hazard, so we upgraded to 200-amp service and relocated the new tankless water heater to the exterior side wall. The gas meter was at capacity, so we converted the whole property to electric water heating, which also satisfied the homeowner’s preference for solar compatibility. Written price: $78,500. The tenant moved in 14 weeks after permit submission.

New Detached ADU: Prefab Coordination with Dvele in South Rialto

Before: flat rear yard with aging aluminum patio cover, no electrical service, and a 3-foot grade change toward the alley
Before: flat rear yard, aging patio cover, no electrical service, 3-foot grade change toward alley
After: 640 sq ft Dvele SmartDwelling with integrated solar, battery backup, and landscaped terrace managing the grade change
After: 640 sq ft Dvele SmartDwelling with solar, battery backup, and landscaped terrace

This homeowner came to us with a Dvele reservation already in place, which is more common than you’d think. The gap most people hit: Dvele delivers a high-performance shell, but someone still needs to handle the Rialto foundation permit, the crane placement survey, the utility tie-ins, and the final inspection. We acted as the single-contract coordinator, which meant our written price covered our site prep plus Dvele’s delivery and set, with no finger-pointing if the slab didn’t match the module’s anchor points. The 3-foot grade change required a retaining wall and stepped terrace, which we designed into the landscape plan from day one. The battery backup qualified for SGIP incentives, which we documented in the permit set. Total project: $312,000, including the Dvele unit, our coordination, and all site work.

Want Results Like These?

Contractor and designer reviewing ADU architectural design plans on a computer
Want Results Like These?

Every project here started with a site walk and a written price. No estimate that evaporates when work starts. No designer and builder blaming each other. If you’ve got a written estimate already, we’ll give you a free second opinion. If you don’t, we’ll bring the clipboard. Call (951) 476-1467 to schedule your free estimate. A live person answers, 24/7.

Written by Nadia Ellery, Owner at Ellery ADU Studio Rialto, serving Rialto since 2015.

Need ADU help in Rialto? Licensed & insured · Free on-site estimates response · free estimates
Call (951) 476-1467
Local Service Coverage

Request a Free Estimate in Rialto

Tell us what you need - Ellery ADU Studio Rialto responds fast. No obligation.

By providing your information above, you acknowledge our Privacy Policy and consent to being contacted via phone, email, or SMS about your request, including by the independent professionals who may fulfill it.

Prefer to text? Send a Text
Call Now - Fast Dispatch